Skip to content
SWAT Alliance logo

Service 20

Station Count

Road-user and passenger activity around station environments.

Indian analyst recording multimodal activity outside an Indian railway station
Station count

How the study is observed

This original conceptual diagram illustrates the study structure. The exact methodology is confirmed against the approved project brief, available source material and local requirements.

Technical visual · Station access diagram
Station access diagramSTATION ACCESS

Study at a glance

Record multimodal access activity around a defined transport-hub boundary.

Typical outputs

  • ↳ Pedestrian and cycle access totals
  • ↳ Bus/taxi/vehicle activity where scoped
  • ↳ Entrance and curb-zone summaries

Review focus

  • ↳ Station-area boundary
  • ↳ Multiple entrances and routes
  • ↳ Peak interchange periods

Service summary

Station counts record agreed pedestrian, cycle, taxi, bus and vehicle activity around a transport hub.

When it is used

Use them for station access, interchange, public-realm and transit-planning studies.

Methodology

Map each entrance, curb zone, route and observation point, then set a mode-specific observation plan.

Inputs and source requirements

Provide a location plan, dates, periods, defined observations, any classifications and required output files.

Movements and classifications

Movement, direction, lane and classification rules are agreed only where they are relevant to this study.

Time intervals

Set the reporting interval and any peak or operating windows before collection or processing.

Typical deliverables

Agreed data tables, location and methodology notes, defined assumptions and quality-review information.

Quality control

Check coverage, definitions, interval structure and delivery format against the approved brief.

Limitations

The result describes the defined observed scope and period; it should not be used to make claims beyond the available evidence.

Privacy and security

Sensitive files, video and identifiers are exchanged only through approved project workflows.

Frequently asked questions

Can each station entrance be separated?

Yes, if entrances are named and visible in the study plan.

Can buses and taxis be included?

Yes, when their observation points and event definitions are included.

  • ISO 9001:2015Quality management
  • ISO 27001:2022Information security
  • Structured QA/QCDefined review checks
  • Global supportProject-specific delivery