Skip to content
SWAT Alliance logo

Service 18

ATC Count

Automatic traffic count data for appropriate survey locations.

Indian field technician checking automatic traffic count equipment on a Canadian road
ATC count

How the study is observed

This original conceptual diagram illustrates the study structure. The exact methodology is confirmed against the approved project brief, available source material and local requirements.

Technical visual · Traffic survey workflow diagram
Traffic survey workflow diagramBRIEFCOLLECTDELIVER

Study at a glance

Scope automatic traffic count outputs around a suitable site, equipment approach, class scheme and reporting interval.

Typical outputs

  • ↳ Volume and interval files
  • ↳ Classification outputs where supported
  • ↳ Installation/coverage notes

Review focus

  • ↳ Equipment suitability and placement
  • ↳ Clock and data continuity
  • ↳ Equipment or retrieval exceptions

Service summary

ATC count scopes set the required automatic-count volumes, classes and reporting intervals for an appropriate location.

When it is used

Use them where a continuous or temporary automated count method is appropriate to the brief.

Methodology

Confirm equipment suitability, count location, class scheme, installation constraints, coverage window and retrieval plan before deployment.

Inputs and source requirements

Provide a location plan, dates, periods, defined observations, any classifications and required output files.

Movements and classifications

Movement, direction, lane and classification rules are agreed only where they are relevant to this study.

Time intervals

Set the reporting interval and any peak or operating windows before collection or processing.

Typical deliverables

Agreed data tables, location and methodology notes, defined assumptions and quality-review information.

Quality control

Check coverage, definitions, interval structure and delivery format against the approved brief.

Limitations

The result describes the defined observed scope and period; it should not be used to make claims beyond the available evidence.

Privacy and security

Sensitive files, video and identifiers are exchanged only through approved project workflows.

Frequently asked questions

Is ATC suitable for every site?

No. Location, power, mounting, traffic mix and required classes must be reviewed first.

Can ATC replace video review?

It depends on the study question and required detail; automatic counts may not show movements or fine classes.

  • ISO 9001:2015Quality management
  • ISO 27001:2022Information security
  • Structured QA/QCDefined review checks
  • Global supportProject-specific delivery